Print it at 100 % on A4. Page 1 is the form you fill in. The next page is the worksheet and reference.
Need the instrument?
What is inside
- Panel details, last maintenance date and a permit and isolation check before work
- Checks for the enclosure, busbars, labels, connections, breakers, relays and interlocks, each with OK, Fixed, Action or N/A
- Insulation resistance table for phase to phase, phase to earth and neutral to earth, with previous values
- Contact and joint resistance table with a previous-worst column, and an earthing table
- Sign-off, next maintenance due and an actions-outstanding box
How it was checked
The form has no calculated values. The 1.5 to 2 times joint resistance multiplier is a practical guide, and the note says to use the maker's limit if one is given. It also says that breaker main-contact tests normally need 100 A or more, so a low-current meter is for lugs and joints.