Print it at 100 % on A4. Page 1 is the form you fill in. The next page is the worksheet and reference.
Need the instrument?
What is inside
- Cable details: type and size, rated voltage, length, installation, conductor temperature and humidity
- Nine ready test lines: each core to earth, core to core, neutral and armour or sheath, with 1 minute and optional 10 minute readings and PI
- A per-kilometre column (IR × length in km) so you can compare a 100 m run with a 1 km run
- Before-and-after checks, a result block and a sign-off
- Page 2: test voltage by cable rating, BS 7671 LV minimums, what common patterns of readings usually mean, and method notes
How it was checked
The per-kilometre conversion and PI are simple ratios with a worked example. The BS 7671 minimums are 0.5 MΩ at 250 V and 1 MΩ at 500 V or 1000 V. The test voltage table and 1 MΩ per kV idea are common practice guides, so use your cable specification where it states a value.